Risk Assessment
The most effective guideline to
perform the risk assessment is ICH Q9., where given the appropriate methodology
for risk assessment. Risk Assessment is most effective tool to identify the
risk evaluation of process operation, operation procedure, analysis procedure,
control parameters, production failure, equipment failure etc.
Principles of Risk Assessment:
To perform and evaluate the risk to
quality shall be performed based on the scientific knowledge, practical
experiences, threw the review of production process, control checks,
probability of malfunction in process parameters, and affected parameters due
to malfunction.
Risk Assessment Process:
Risk assessment shall be performed
based on following question, but not limited to:To identify the probability of risk
To analysis the risk, which types of risk to be occurred?
To evaluate the risk and which affected up to what extended
What and how control checks or tools to be implementing for reduction or prevent the risk?
How and up to what extended risk can be allow?
Finally to review the risk assessment report frequently or when as change to be proposed.
Responsibilities for assessment the risk
In general, Quality unites will be
responsible to assessment the risk. But however it is not mandatory. Risk
assessment to be performed with the help of concerned department. Who have the
scientific knowledge, practical experience of system, operation, procedure etc.
it can be done with the quality management system, where experts from the
different areas will together to identify, evaluate and make effective system
and control to reduce the probable risk.
What are the basic question to be ask for risk identification,
evaluation and prevent
What might be wrong in process?What is the probability to go wrong?
What are the possibilities of the consequences?
Risk identification:
It is a systematic use of information to find out the hazards which referring to the risk or problem. Risk identification can be done based on the historical data, theoretical analysis data, collect the information from direct concerned personnel who are perform the activity, which need to evaluate the risk.
Risk Analysis:
To make the effective qualitative or
quantitative system or analysis tools, which give the help to identify the
defect in process or like hood occurrence? The analysis tools must have the
capability to detect, management and control on identified risk.
Risk Evaluation:
To compare the identified and
analyzed risk against the risk criteria. Risk assessment to be either a
quantitative estimate of risk or a qualitative description of range of risk.
Risk can be determined as “Significant”, “Minor”, “Moderate”, “Major” and
“Catastrophic” or “High”, “Medium” and “Low”. Risk assessment can be done based
on the RPN number “Risk Probability Number”. In RPN, methodology, each risk
category to be define in ascending number as 1, 2, 3, 4, 5 or 1, 2 and 3 as
respective above categories.
Equation for Risk Assessment:
Risk = consequences or like hood x RPN of severity (Maximum is 5 x 5 =
25)
Identified risk or process shall be evaluate based on following
statically tools
Example for Risk AssessmentConsequences or like hood RPN Number (severity)
Significant 1
Minor 2
Moderate 3
Major 4
Catastrophic 5
If the identified risk is fall
significant, then risk of severity shall be as 1, which indicate the risk to be
very less. If the identified risk is fall
Catastrophic, then risk of severity shall be as 5, which indicate the risk to
be very high, hence the preventive action to be taken to reduce the
consequences of identified risk. Finally submission to be done for all
identified consequences to get the cumulative RPN number. Calculated RPN number
should not be more than 25. if it is, then strong corrective action to be taken
to prevent or reduce the risk.
Risk Assessment in Pharmaceutical industries will be done based
on following non-exhaustive tools
FEMA :
Failure Mode Effects AnalysisFEMECA : Failure Mode, Effects and Criticality Analysis
FTA : Fault Tree Analysis
HACCP : Hazard Analysis and Critical Control Points
HAZOP : Hazard Operability Analysis
PHA : Preliminary Hazard Analysis
I want to share with you all here on how I get my loan from Mr Benjamin who help me with loan of 400,000.00 Euro to improve my business, It was easy and swift when i apply for the loan when things was getting rough with my business Mr Benjamin grant me loan without delay. here is Mr Benjamin email/whatsapp contact: +1 989-394-3740, lfdsloans@outlook.com /