Change control types in Quality Assurance system


Change control procedure: A formal controlled documented process by which qualified representatives from appropriate discipline, review, propose and make changes to an approved system.
Temporary change:
A change  initiated  for the evaluation of proposed system / procedure which has been taken with prior approval to achieve the desired goal  and allowed for one time change &  limited to a particular batch. For example, the  change in batch size, Equipment ,  part dispatch of batch etc.
Permanent change: A change initiated based upon scientific rational or historical GMP data or data generated through temporary changes.