Change control procedure: A formal controlled documented process
by which qualified representatives from appropriate discipline, review,
propose and make changes to an approved system.
|
Temporary change:
A change initiated for the evaluation of proposed system /
procedure which has been taken with prior approval to achieve the desired
goal and allowed for one time change
& limited to a particular batch.
For example, the change in batch size,
Equipment , part dispatch of batch
etc.
|
Permanent change: A
change initiated based upon scientific rational or historical GMP data or
data generated through temporary changes.
|